A filing, rezoning request or route study is not an approval. Follow the linked county, SCC, Dominion or VDOT record for the newest status.
DC #1Data CentersUnder Construction
Stafford Technology Campus
Eskimo Hill Road / Richmond Highway
538.75 acres · 5.8M sq ft- Parcel
- 38-29B and associated campus parcels
- District
- Falmouth
- Zoning
- M-2 / A-1
The county map’s largest approved campus, under phased construction by STACK Infrastructure.
DC #2Data CentersUnder Construction
Old Potomac Church Data Center
Old Potomac Church Road near Hospital Center Boulevard
49.90 acres · 478,310 sq ft- Parcel
- 39-71A
- District
- Not listed in map
- Zoning
- B-2
Two-building approved campus now listed by the county as under construction.
DC #3Data CentersApproved
Centreport Gateway Pemberton Tech Center
South side of Centreport Parkway
51.20 acres · 577,000 sq ft in GIS- Parcel
- 37-25
- District
- Hartwood
- Zoning
- B-2
Approved campus with related Pemberton electrical-substation work.
DC #4Data CentersUnder Construction
Vantage VA4 (Melrod)
Centreport Parkway near Stafford Regional Airport
≈82 acres · county model: 926,800 sq ft- Parcel
- 37-30 and associated parcels
- District
- Hartwood
- Zoning
- M-1
Three-building Vantage campus; construction began in 2025.
DC #5Data CentersApproved
Cranes Corner Tech Center
Richmond Highway near Centreport Parkway
46.03 mapped acres · 790,000 sq ft- Parcel
- 46-10; 46-8A
- District
- Falmouth
- Zoning
- M-1 / A-1
Approved three-building campus with a separately reviewed electrical substation.
DC #6Data CentersIn Review
Enon Tech Park
Enon Road and Wyatt Lane
159.68 mapped acres · 2.0M sq ft- Parcel
- 45-133A; 45-227; 45-127F; 45-127A
- District
- Hartwood
- Zoning
- A-1 / M-1
Proposed technology park with data centers, substations and supporting infrastructure.
DC #7Data CentersIn Review
Austin Ridge Logistics Center
Austin Ridge Drive, west of I-95
182.73 mapped acres · 1.582M sq ft- Parcel
- Multiple Austin Ridge parcels
- District
- Hartwood
- Zoning
- M-1
Pending industrial-area application for data-center, warehouse and substation uses.
DC #8Data CentersIn Review
GWV Data Centers
West of I-95 near Ramoth Church and Kellogg Mill roads
≈1,041.69 acres · 7.9M sq ft- Parcel
- Multiple parcels in the GWV assemblage
- District
- Hartwood
- Zoning
- A-1 / A-2 / B-2 / M-1
Large multi-parcel campus proposal with multiple data-center and utility components.
DC #9Data CentersIn Review
Potomac Creek Campus
South of Eskimo Hill Road, east of Richmond Highway
99.33 acres · 975,000 sq ft- Parcel
- 38-126
- District
- Falmouth
- Zoning
- A-1
Pending campus and related substation applications on Potomac Creek property.
DC #10Data CentersIn Review
Accokeek Center
East of I-95, north of Buttercup Lane
≈120.88 application acres · 1.134M sq ft in GIS- Parcel
- 38-96; 38-74A and related parcels
- District
- Falmouth
- Zoning
- A-1 / B-3
Pending rezoning for a multi-tenant industrial or data-center development.
DC #11Data CentersIn Review
Blaisdell Data Center
South of Warrenton Road around Olde Forge Drive and Blaisdell Lane
181.34 acres · 11 parcels- Parcel
- 53-1J, 1K, 1M, 1N, 1P, 1R, 1S, 1T, 1U, 1V, 1W
- District
- George Washington
- Zoning
- A-1 / B-2; M-2 requested
Pending rezoning and substation proposal for a new industrial data-center campus.
DC #12Data CentersIn Review
Simms Farm
Kings Highway between Hollywood Farm Road and Layover Lane
204.71 acres- Parcel
- 60-37
- District
- George Washington
- Zoning
- A-1
Proposed industrial campus with data-center buildings, electrical substations and accessory uses.
DC #13Data CentersIn Review—Substation Only
Sisson North
North of Kings Highway between Albion Lane and Layover Lane
39.86 mapped acres- Parcel
- 59-75
- District
- George Washington
- Zoning
- A-1
The county map identifies this parcel as a substation-only review within the broader Sisson North utility application.
DC #14Data CentersIn Review
Sisson South
South of Kings Highway between Michael Scott Lane and Appleton Hall Drive
114.37 mapped acres- Parcel
- 59-75B
- District
- George Washington
- Zoning
- A-1
Mapped parcel within a broader 340.50-acre data-center and substation rezoning application.
DC #15Data CentersIn Review
Forest Lane Data Center
South of Forest Lane Road between Kings Highway and Caisson Road
844.92 acres- Parcel
- 59-67A; 59-67; 59-70; 59-71C; 59-71
- District
- George Washington
- Zoning
- A-1 / M-1 / M-2
Large pending data-center campus with electrical substations and related facilities.
DC #16Data CentersIn Review
Eskimo Hill Tech Center
South of Eskimo Hill Road between Richmond Highway and Potomac Run Road
142.24 mapped acres · 681,800 sq ft- Parcel
- 38-130A; 38-130; 38-125
- District
- Falmouth
- Zoning
- A-1
Pending campus and substation proposal; the Board deferred action in July 2026 after cemetery concerns.
17Power & TransmissionUnder Construction
Centreport 230 kV Loop & Substation
Centreport Parkway / Stafford Regional Airport area
New double-circuit 230 kV line + Centreport SubstationDominion project approved by the SCC in June 2025; construction notices were issued in 2026.
18Power & TransmissionProposed
North Anna–Thornburg–Bristers Corridor
Regional corridor through Stafford County
Proposed 500 kV + 230 kV facilities; Stafford section filing planned for 2027Dominion’s Stafford-crossing northern section remains in route, technical and environmental review. No Stafford route has been approved.
19Power & TransmissionApproved
Aquia Harbour–Possum Point Line Rebuild
Stafford and Prince William counties / Fredericksburg
Rebuild of Lines #29, #252, #2083 and #568A multi-jurisdiction Dominion rebuild filed as SCC case PUR-2024-00142.
20Power & TransmissionApproved
Fredericksburg–Aquia Harbour 230 kV Rebuild
City of Fredericksburg and Stafford County
Partial rebuild of Lines #29, #2104 and #2157A separate Dominion line-rebuild project filed as SCC case PUR-2024-00035.
21TransportationUnder Construction
Route 1 & Courthouse Road Improvements
Route 1 at Courthouse, Bells Hill and Hope roads
Four-lane divided section, turn lanes, sidewalks and crosswalksStafford-administered widening and intersection work is expected to finish in 2027.
22TransportationUnder Construction
Route 1 over Chopawamsic Creek Bridge
Stafford–Prince William county line near Quantico
Four-lane bridge replacement · completion expected June 2028Phased replacement of the structurally deficient Route 1 bridge while keeping the highway open.
23TransportationProposed
Route 1 / Enon Road Improvements
Route 1, Enon Road and Stafford Indians Lane
$25.5M · 0.63-mile widening · construction planned 2028–2029Design work covers turn lanes, a center lane and sidewalks serving the Stafford High School entrance area.
24TransportationProposed
Falmouth Bridge Rehabilitation
Route 1 over the Rappahannock River
Superstructure replacement + separated shared-use pathA major rehabilitation of the bridge connecting Stafford and Fredericksburg, including new girders, deck, rails and pedestrian/bicycle space.